0 of 10 Questions completed
Questions:
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
0 of 10 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Which of the following is NOT a primary purpose of ENERGY STAR?
Which CO2 emitting sector is NOT directly influenced by ENERGY STAR?
Which of the following is responsible for ensuring the integrity of the ENERGY STAR program?
What percentage of total energy savings is required for a home to be certified through Home Performance with ENERGY STAR?
Which EPA tool is used to apply for certification through the ENERGY STAR commercial program?
What is the minimum ENERGY STAR score required for both commercial and industrial certifications?
Which of the following LEED O+M categories is NOT influenced by ENERGY STAR?
How long must the performance of a commercial building be tracked before it is eligible for ENERGY STAR certification?
The 3rd party verification for an industrial plant certification must be performed by:
Which of the following forms is submitted to apply for certification through the ENERGY STAR industrial program?
Register now to get started.