A project with older existing HVAC&R system that uses CFC’s is pursuing EA Credit Enhanced Refrigerant
Management. What can the project team do to earn LEED Certification?
A project planning to purchased green power through carbon offsets must meet which certification’s
standards to qualify as off-site renewable sources of energy for LEED Projects?
A project is planning to implement EA Credit Demand Response. Which of the following strategies qualify
for demand reduction strategies during a DR Event? (Choose 1)
A project is planning on increasing ventilation for enhanced indoor environment quality. Which of the
following may be a side effect due to increasing the ventilation in a building?
What is the minimum contract length required for a project to implement Green Power and Carbon
Offsets in order to be eligible for EA Credit Green Power and Carbon offsets?
Which of the following includes the scope of ongoing commissioning?
Which of the following includes the scope of monitoring based commissioning?
During which project phase is the Basis of Design created?
A project is pursuing EA Credit enhanced commissioning and the CxA is developing an ongoing Cx Plan as part of a ten month review. Which information is true regarding performing ongoing commissioning for the LEED Project?
A CxA has conducted the installation inspections and functional performance tests of all required systems
in a building. After documenting the findings and recommendations in the Cx Report what must be done
with the Cx Report in order to achieve EA Prerequisite Building Commissioning and Verification?
A project used prescriptive compliance path for EA Prerequisite Minimum Energy Performance. Which of
the following resources can the project use to compute energy cost for EA Credit Renewable Energy
Production?